Old photos of the factory
{short description of image} The 10,000 sq. m. (100,000 sq.ft.) site in Centelles is now cleared (of potatoes!) and flat. January 1999.
Pedro Roquet Baucells (Production Director) checking progress in March 1999. Pedro Roquet Baucells (Production Director) checking progress. March 1999.
{short description of image} The roof is on and the far wall panels are being positioned. May 1999.
{short description of image} The walls, windows and floor are all complete. Electric services etc. are being installed and the surrounding area is ready for paving. September 1999.
A few lathes and machining centres have started to arrive and are being installed in the machining bay. September 1999.
One of the welding robots has arrived and is being installed. September 1999.
The assembly / test bay is being painted prior to installation of assembly, test and painting facilities. September 1999.
The goods receiving / despatch bay - two docks can be seen. both fitted with dock-levellers (Roquet power packs and cylinders !). September 1999.
  Two large lathes making cylinder rods and tubes. Rapid automatic part transfer. Feb 2000.
Machining centres now making pieces. Feb 2000.
The paint line being installed. Feb 2000.
A welding robot welding test pieces. Feb 2000.
Ultrasonic cleaning machines with automatic part transfer awaiting arrival of honing machines. Feb 2000.